RINCIAN ANGGARAN BIAYA PEMBANGUNAN GEDUNG



RENCANA ANGGARAN BIAYA (RKB)
PEMBANGUNAN GEDUNG RUANG KELAS BARU (RKB) TIGA LOKAL
SMPS IT NUR KHALIFAH DESA BIANG KEKE KEC. PA’JUKUKANG KAB. BANTAENG
TAHUN 2018

NO
NAMA BARANG
VOLUME
HARGA SATUAN
JUMLAH
I
PEKERJAAN PONDASI 1,5 X 90
1
Batu Kali
78
M3
125,000
 9,750,000
2
Pasir
37
M3
200,000
 7,400,000
3
Semen 50 Kg
58
Sak
58,000
 3,364,000

Jumlah
 20,514,000
II
PEKERJAAN SLOOF 0,15 X 0,2 X 90 m
1
Kerikil 2/1
2
M3
325,000
 650,000
2
Pasir
1.7
M3
200,000
 340,000
3
Semen 50 Kg
17
Sak
58,000
 986,000
4
Besi 10 Sig
32
Btg
62,000
 1,984,000
5
Besi 6 Super
30
Btg
25,000
 750,000
6
Kawat beton
5
Kg
20,000
 100,000
7
Papan Mal
1
M3
1,000,000
 1,000,000

Jumlah
 5,810,000
III
PEKERJAAN PASANGAN BATU/COR KOLONG
1
Batu Merah
25,000
Biji
600
 15,000,000
2
Pasir
16
M3
200,000
 3,200,000
3
Kerikil 2/1
4
M3
130,000
 520,000
4
Semen 50 Kg
150
Sak
58,000
 8,700,000
5
Besi 10 Sig
53
Btg
62,000
 3,286,000
6
Besi 6 Super
50
Btg
25,000
 1,250,000
7
Kawat beton
7
Kg
20,000
 140,000
8
Papan Mal
1
M3
1,000,000
 1,000,000

Jumlah
 33,096,000
IV
PEKERJAAN RIMBAL
1
Kerikil 2/1
2
M3
130,000
 260,000
2
Pasir
1.7
M3
200,000
 340,000
3
Semen 50 Kg
17
Sak
58,000
 986,000
4
Besi 10 Sig
32
Btg
62,000
 1,984,000
5
Besi 6 Super
30
Btg
25,000
 750,000
6
Kawat beton
5
Kg
20,000
 100,000
7
Papan Mal
1
M3
1,000,000
 1,000,000

Jumlah
 5,420,000
V
PEKERJAAN PLESTERAN 680 M2
1
Pasir
21
M3
200,000
 4,200,000
2
Semen 50 Kg
113
Sak
58,000
 6,554,000

Jumlah
 10,754,000
VI
PEKERJAAN ATAP
1
Seng  6 KK
350
Lmbr
41,000
 14,350,000
5
Seng Licin
1
Rol
650,000
 650,000

Jumlah
 15,000,000
VII
PEKERJAAN RANGKA
1
6/12
3
M3
2,200,000
 6,600,000
2
5/10
3
M3
2,000,000
 6,000,000

Jumlah
 12,600,000
VIII
PEKERJAAN PLAPON
1
Balok 4/6
2
M3
2,200,000
 4,400,000
2
Tripleks 4 mm
125
Lmbr
65,000
 8,125,000

Jumlah
 12,525,000
IX
PEKERJAAN ACIAN
1
Aplus
100
Sak
58,000
 5,800,000

Jumlah
 5,800,000
X
PEKERJAAN PENGECATAN
1
Tembok
250
Kg
60,000
 15,000,000
2
Kuseng
25
Kg
55,000
 1,375,000
3
Plapon
75
Kg
60,000
 4,500,000

Jumlah
 20,875,000
XI
PEKERJAAN LANTAI
1
Tegel 40 x 40
300
Dos
50,000
 15,000,000
2
Semen 50 Kg
75
Kg
58,000
 4,350,000
3
Pasir
8
M3
200,000
 1,600,000

Jumlah
 20,950,000
XII
PEKERJAAN KACA 5 mm
1
Kaca 1 x 0,7
27
Lmbr
100,000
 2,700,000
2
Kaca 0,5 x 0,7
18
Lmbr
50,000
 900,000

Jumlah
 3,600,000
XIII
PEKERJAAN SISIR JENDELA
1
Papan Kelas I
1.2
M3
4,200,000
 5,040,000

Jumlah
 5,040,000
XIV
BIAYA PEMBELIAN PAKU
1
Paku 5 cm
20
Kg
18,000
 360,000
2
Paku 7 Cm
30
Kg
18,000
 540,000
3
Paku 10 Cm
40
Kg
18,000
 720,000
4
Paku Payung
20
Kg
25,000
 500,000

Jumlah
 2,120,000
XV
UPAH TUKANG
1
Upah Tukang
1
Org
75,000,000
 75,000,000

Jumlah
 75,000,000
XVI
PEKERJAAN INSTALASI
1
Instalasi
1
x
5,000,000
 5,000,000

Jumlah
 5,000,000
XVII
BIAYA LAIN-LAIN
1
Kunci Pintu
1
Set
750,000
 750,000
2
Engsel
1
Set
350,000
 350,000
3
Rak Angin
1
Set
200,000
 200,000

Jumlah
 1,300,000
XVIII
PEKERJAAN KAYU KUSENG
1
Kayu Kuseng
2.5
M3
8,400,000
 21,000,000

Jumlah
 21,000,000
XIX
PEKERJAAN KAYU PINTU/JENDELA
1
Bingkai 4 x 10
0.18
M3
2,000,000
 360,000
2
Papan
30
M
150,000
 4,500,000
3
0,04 x 0,08
0.37
M3
1,500,000
 555,000

Jumlah
 5,415,000
XX
REKAPITULASI










I
PEKERJAAN PONDASI 1,5 X 90
Rp
20,514,000

II
PEKERJAAN SLOOF 0,15X 0,2 X 90 m
Rp
5,810,000

III
PEKERJAAN PASANGAN BATU
Rp
33,096,000

IV
PEKERJAAN RIMBAL
Rp
5,420,000

V
PEKERJAAN PLASTERAN 680 m2
Rp
10,754,000

VI
PEKERJAAN ATAP
Rp
15,000,000

VII
PEKERJAAN RANGKA
Rp
12,600,000

VIII
PEKERJAAN PLAFON
Rp
12,525,000

IX
PEKERJAAN ACIAN
Rp
5,800,000

X
PEKERJAAN PENGECATAN
Rp
20,875,000

XI
PEKERJAAN LAINTAI
Rp
20,950,000

XII
PEKERJAAN KACA 5mm
Rp
3,600,000

XIII
PEKERJAAN SISIR JENDELA
Rp
5,040,000

XIV
BIAYA PEMBELIAN PAKU
Rp
2,120,000

XV
UPAH TUKANG
Rp
75,000,000

XVI
PEKERJAAN INSTALASI
Rp
5,000,000

XVII
BIAYA LAIN-LAIN
Rp
1,300,000

XVIII
PEKERJAAN KAYU KUSENG
Rp
21,000,000

XIX
PEKERJAAN KAYU PINTU/JENDELA
Rp
5,415,000


TOTAL
Rp
281,819,000

Comments

Popular posts from this blog

CARA PALING MUDAH MENGENDALIKAN EMOSI

PROPOSAL WIRAUSAHA BARU KRIPIK UBI GORENG