RINCIAN ANGGARAN BIAYA PEMBANGUNAN GEDUNG
|
RENCANA ANGGARAN BIAYA (RKB)
|
||||||
|
PEMBANGUNAN GEDUNG RUANG KELAS BARU
(RKB) TIGA LOKAL
|
||||||
|
SMPS IT NUR KHALIFAH DESA BIANG KEKE
KEC. PA’JUKUKANG KAB. BANTAENG
|
||||||
|
TAHUN 2018
|
||||||
|
NO
|
NAMA BARANG
|
VOLUME
|
HARGA SATUAN
|
JUMLAH
|
||
|
I
|
PEKERJAAN
PONDASI 1,5 X 90
|
|||||
|
1
|
Batu Kali
|
78
|
M3
|
125,000
|
9,750,000
|
|
|
2
|
Pasir
|
37
|
M3
|
200,000
|
7,400,000
|
|
|
3
|
Semen 50 Kg
|
58
|
Sak
|
58,000
|
3,364,000
|
|
|
|
Jumlah
|
20,514,000
|
||||
|
II
|
PEKERJAAN
SLOOF 0,15 X 0,2 X 90 m
|
|||||
|
1
|
Kerikil 2/1
|
2
|
M3
|
325,000
|
650,000
|
|
|
2
|
Pasir
|
1.7
|
M3
|
200,000
|
340,000
|
|
|
3
|
Semen 50 Kg
|
17
|
Sak
|
58,000
|
986,000
|
|
|
4
|
Besi 10 Sig
|
32
|
Btg
|
62,000
|
1,984,000
|
|
|
5
|
Besi 6 Super
|
30
|
Btg
|
25,000
|
750,000
|
|
|
6
|
Kawat beton
|
5
|
Kg
|
20,000
|
100,000
|
|
|
7
|
Papan Mal
|
1
|
M3
|
1,000,000
|
1,000,000
|
|
|
|
Jumlah
|
5,810,000
|
||||
|
III
|
PEKERJAAN
PASANGAN BATU/COR KOLONG
|
|||||
|
1
|
Batu Merah
|
25,000
|
Biji
|
600
|
15,000,000
|
|
|
2
|
Pasir
|
16
|
M3
|
200,000
|
3,200,000
|
|
|
3
|
Kerikil 2/1
|
4
|
M3
|
130,000
|
520,000
|
|
|
4
|
Semen 50 Kg
|
150
|
Sak
|
58,000
|
8,700,000
|
|
|
5
|
Besi 10 Sig
|
53
|
Btg
|
62,000
|
3,286,000
|
|
|
6
|
Besi 6 Super
|
50
|
Btg
|
25,000
|
1,250,000
|
|
|
7
|
Kawat beton
|
7
|
Kg
|
20,000
|
140,000
|
|
|
8
|
Papan Mal
|
1
|
M3
|
1,000,000
|
1,000,000
|
|
|
|
Jumlah
|
33,096,000
|
||||
|
IV
|
PEKERJAAN
RIMBAL
|
|||||
|
1
|
Kerikil 2/1
|
2
|
M3
|
130,000
|
260,000
|
|
|
2
|
Pasir
|
1.7
|
M3
|
200,000
|
340,000
|
|
|
3
|
Semen 50 Kg
|
17
|
Sak
|
58,000
|
986,000
|
|
|
4
|
Besi 10 Sig
|
32
|
Btg
|
62,000
|
1,984,000
|
|
|
5
|
Besi 6 Super
|
30
|
Btg
|
25,000
|
750,000
|
|
|
6
|
Kawat beton
|
5
|
Kg
|
20,000
|
100,000
|
|
|
7
|
Papan Mal
|
1
|
M3
|
1,000,000
|
1,000,000
|
|
|
|
Jumlah
|
5,420,000
|
||||
|
V
|
PEKERJAAN
PLESTERAN 680 M2
|
|||||
|
1
|
Pasir
|
21
|
M3
|
200,000
|
4,200,000
|
|
|
2
|
Semen 50 Kg
|
113
|
Sak
|
58,000
|
6,554,000
|
|
|
|
Jumlah
|
10,754,000
|
||||
|
VI
|
PEKERJAAN ATAP
|
|||||
|
1
|
Seng 6 KK
|
350
|
Lmbr
|
41,000
|
14,350,000
|
|
|
5
|
Seng Licin
|
1
|
Rol
|
650,000
|
650,000
|
|
|
|
Jumlah
|
15,000,000
|
||||
|
VII
|
PEKERJAAN
RANGKA
|
|||||
|
1
|
6/12
|
3
|
M3
|
2,200,000
|
6,600,000
|
|
|
2
|
5/10
|
3
|
M3
|
2,000,000
|
6,000,000
|
|
|
|
Jumlah
|
12,600,000
|
||||
|
VIII
|
PEKERJAAN
PLAPON
|
|||||
|
1
|
Balok 4/6
|
2
|
M3
|
2,200,000
|
4,400,000
|
|
|
2
|
Tripleks 4 mm
|
125
|
Lmbr
|
65,000
|
8,125,000
|
|
|
|
Jumlah
|
12,525,000
|
||||
|
IX
|
PEKERJAAN
ACIAN
|
|||||
|
1
|
Aplus
|
100
|
Sak
|
58,000
|
5,800,000
|
|
|
|
Jumlah
|
5,800,000
|
||||
|
X
|
PEKERJAAN
PENGECATAN
|
|||||
|
1
|
Tembok
|
250
|
Kg
|
60,000
|
15,000,000
|
|
|
2
|
Kuseng
|
25
|
Kg
|
55,000
|
1,375,000
|
|
|
3
|
Plapon
|
75
|
Kg
|
60,000
|
4,500,000
|
|
|
|
Jumlah
|
20,875,000
|
||||
|
XI
|
PEKERJAAN
LANTAI
|
|||||
|
1
|
Tegel 40 x 40
|
300
|
Dos
|
50,000
|
15,000,000
|
|
|
2
|
Semen 50 Kg
|
75
|
Kg
|
58,000
|
4,350,000
|
|
|
3
|
Pasir
|
8
|
M3
|
200,000
|
1,600,000
|
|
|
|
Jumlah
|
20,950,000
|
||||
|
XII
|
PEKERJAAN KACA
5 mm
|
|||||
|
1
|
Kaca 1 x 0,7
|
27
|
Lmbr
|
100,000
|
2,700,000
|
|
|
2
|
Kaca 0,5 x 0,7
|
18
|
Lmbr
|
50,000
|
900,000
|
|
|
|
Jumlah
|
3,600,000
|
||||
|
XIII
|
PEKERJAAN
SISIR JENDELA
|
|||||
|
1
|
Papan Kelas I
|
1.2
|
M3
|
4,200,000
|
5,040,000
|
|
|
|
Jumlah
|
5,040,000
|
||||
|
XIV
|
BIAYA
PEMBELIAN PAKU
|
|||||
|
1
|
Paku 5 cm
|
20
|
Kg
|
18,000
|
360,000
|
|
|
2
|
Paku 7 Cm
|
30
|
Kg
|
18,000
|
540,000
|
|
|
3
|
Paku 10 Cm
|
40
|
Kg
|
18,000
|
720,000
|
|
|
4
|
Paku Payung
|
20
|
Kg
|
25,000
|
500,000
|
|
|
|
Jumlah
|
2,120,000
|
||||
|
XV
|
UPAH TUKANG
|
|||||
|
1
|
Upah Tukang
|
1
|
Org
|
75,000,000
|
75,000,000
|
|
|
|
Jumlah
|
75,000,000
|
||||
|
XVI
|
PEKERJAAN
INSTALASI
|
|||||
|
1
|
Instalasi
|
1
|
x
|
5,000,000
|
5,000,000
|
|
|
|
Jumlah
|
5,000,000
|
||||
|
XVII
|
BIAYA
LAIN-LAIN
|
|||||
|
1
|
Kunci Pintu
|
1
|
Set
|
750,000
|
750,000
|
|
|
2
|
Engsel
|
1
|
Set
|
350,000
|
350,000
|
|
|
3
|
Rak Angin
|
1
|
Set
|
200,000
|
200,000
|
|
|
|
Jumlah
|
1,300,000
|
||||
|
XVIII
|
PEKERJAAN KAYU
KUSENG
|
|||||
|
1
|
Kayu Kuseng
|
2.5
|
M3
|
8,400,000
|
21,000,000
|
|
|
|
Jumlah
|
21,000,000
|
||||
|
XIX
|
PEKERJAAN KAYU
PINTU/JENDELA
|
|||||
|
1
|
Bingkai 4 x 10
|
0.18
|
M3
|
2,000,000
|
360,000
|
|
|
2
|
Papan
|
30
|
M
|
150,000
|
4,500,000
|
|
|
3
|
0,04 x 0,08
|
0.37
|
M3
|
1,500,000
|
555,000
|
|
|
|
Jumlah
|
5,415,000
|
||||
|
XX
|
REKAPITULASI
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I
|
PEKERJAAN
PONDASI 1,5 X 90
|
Rp
|
20,514,000
|
|
||
|
II
|
PEKERJAAN
SLOOF 0,15X 0,2 X 90 m
|
Rp
|
5,810,000
|
|
||
|
III
|
PEKERJAAN
PASANGAN BATU
|
Rp
|
33,096,000
|
|
||
|
IV
|
PEKERJAAN
RIMBAL
|
Rp
|
5,420,000
|
|
||
|
V
|
PEKERJAAN
PLASTERAN 680 m2
|
Rp
|
10,754,000
|
|
||
|
VI
|
PEKERJAAN ATAP
|
Rp
|
15,000,000
|
|
||
|
VII
|
PEKERJAAN
RANGKA
|
Rp
|
12,600,000
|
|
||
|
VIII
|
PEKERJAAN
PLAFON
|
Rp
|
12,525,000
|
|
||
|
IX
|
PEKERJAAN
ACIAN
|
Rp
|
5,800,000
|
|
||
|
X
|
PEKERJAAN
PENGECATAN
|
Rp
|
20,875,000
|
|
||
|
XI
|
PEKERJAAN
LAINTAI
|
Rp
|
20,950,000
|
|
||
|
XII
|
PEKERJAAN KACA
5mm
|
Rp
|
3,600,000
|
|
||
|
XIII
|
PEKERJAAN SISIR
JENDELA
|
Rp
|
5,040,000
|
|
||
|
XIV
|
BIAYA
PEMBELIAN PAKU
|
Rp
|
2,120,000
|
|
||
|
XV
|
UPAH TUKANG
|
Rp
|
75,000,000
|
|
||
|
XVI
|
PEKERJAAN
INSTALASI
|
Rp
|
5,000,000
|
|
||
|
XVII
|
BIAYA
LAIN-LAIN
|
Rp
|
1,300,000
|
|
||
|
XVIII
|
PEKERJAAN KAYU
KUSENG
|
Rp
|
21,000,000
|
|
||
|
XIX
|
PEKERJAAN KAYU
PINTU/JENDELA
|
Rp
|
5,415,000
|
|
||
|
|
TOTAL
|
Rp
|
281,819,000
|
|
||